+
  • 86cf3f7d-e680-45bb-83ad-5030067b2980(1).jpg

The electrification transformation project of the Hongliuhe to Wuxi section of Lanxin line

Classification:

Engineering cases

Product accessories:


Product Introduction

 

The electrification transformation project of
the Hongliuhe to Wuxi section of Lanxin line

Lanxin Railway Electrification Project Headquarters
of China Railway Construction Electrification Bureau
Group Co., Ltd.

DT Tie line

UT-1709P

6500

2010.06.16

good

Pre-twisted wire tension clamp

DG4545

80

Pre-twisted wire tension clamp

DG4548

540

Pre-twisted wire tension clamp

DG4550

50

Pre-twisted wire tension clamp

DG4551

750

Pre-twisted wire tension clamp

DG4552T2

90