+
  • f9fde40f-b183-4801-8d01-2ee679443e4e(1).jpg

Wind zone test section of Hongwu electrification renovation project on Lanxin line

Classification:

Engineering cases

Product accessories:


Product Introduction

Wind zone test section of Hongwu electrification
renovation project on Lanxin line

China Railway Electrification Bureau
Group Second Engineering Co., Ltd.

Pre-twisted strain clamp

DG4551

30

2010.04.15

good

Pre-twisted strain clamp

DG4548

30

Pre-twisted suspension clamp

AGS-2118

149

Pre-twisted protection strip

PL-0142

285

Pre-twisted protection strip

CPR-1300150A

325

Pre-twisted protection strip

CPR-1300095/600

78