+
  • c3938c52-f648-45af-bcca-b68ab0c990fe(1).jpg

Catenary wind area of ​​Hongliuhe to Wuxi section of Lanxin line electrification transformation project

Classification:

Engineering cases

Product accessories:


Product Introduction

 

Catenary wind area of Hongliuhe to
Wuxi section of Lanxin line electrification transformation project

Lanxin Railway Electrification Project Headquarters of
China Railway Construction Electrification
Bureau Group Co., Ltd.

Wind zone pre-twisted suspension clamp

Suitable for AF cable (240 wire)

7309

2011.07.15

The project is being implemented

AFWire jumper connection strip

JLS-0144

230

Pre-twisted wire tension clamp

DG-4551

460

PWWire jumper connection strip

JLS-0137

230

Pre-twisted wire tension clamp

DG-4548

460